https://www.outerbanksvoice.com/2024/07/25/construction-of-mid-currituck-bridge-could-start-in-2026/
A Public Private Partnership (P3) was attempted in 2009 and was to be the state’s 1st P3. See Above Post.
https://www.outerbanksvoice.com/2024/07/25/construction-of-mid-currituck-bridge-could-start-in-2026/
A Public Private Partnership (P3) was attempted in 2009 and was to be the state’s 1st P3. See Above Post.
Comments are closed.
Recent Comments